Space Computing Energy Tech Transport Science Dev Loyalty ↗ ◐ Dark mode ◎ Enable Alerts
Compare · Reactors & SMRs

Chooz B-2 vs Civaux-2

RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE) #5 VS #7 CHECKED 06 SEPT 2026
Side by side
Verdict

Chooz B-2 ranks #5 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,500 MWe); Civaux-2 ranks #7 (1,495 MWe).

Rank 05 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,500 MWe
MakerEDF (N4)
Date1997
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, CHOOZ B-2, Operational, model N4 REP 1450: Reference Unit Power 1500 MWe, Design Net 1455, Gross 1560, Thermal 4270 MWt. First grid 10 Apr 1997. Page last update 2026-05-28. Twin unit Chooz B-1 is the same palier; its live detail page did not render here so only B-2 is ranked from the live PRIS sheet.
Rank 07 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,495 MWe
MakerEDF (N4)
Date1999
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, CIVAUX-2, Operational, model N4 REP 1450: Reference Unit Power 1495 MWe, Design Net 1450, Gross 1561, Thermal 4270 MWt. First grid 24 Dec 1999. Tied with Civaux-1.
Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page Last checked 06 Sept 2026
Full Reactors & SMRs ranking Spot an error? Send a tip