Space Computing Energy Tech Transport Science Dev Loyalty ↗ ◐ Dark mode ◎ Enable Alerts
Compare · Reactors & SMRs

Civaux-1 vs Peach Bottom-3

RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE) #6 VS #10 CHECKED 06 SEPT 2026
Side by side
Verdict

Civaux-1 ranks #6 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,495 MWe); Peach Bottom-3 ranks #10 (1,331 MWe).

Rank 06 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,495 MWe
MakerEDF (N4)
Date1997
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, CIVAUX-1, Operational, model N4 REP 1450: Reference Unit Power 1495 MWe, Design Net 1450, Gross 1561, Thermal 4270 MWt. First grid 24 Dec 1997.
Rank 10 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,331 MWe
MakerConstellation (BWR-4)
Date1974
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, PEACH BOTTOM-3, Operational: Reference Unit Power 1331 MWe, Design Net 1065, Gross 1412, Thermal 3951 MWt. First grid 1 Sep 1974. Uprated well above original design net; 2019-2025 history rows carry 1331 MW. Peach Bottom-2 on the same site is 1300 MWe net and was not needed once ten rows were filled.
Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page Last checked 06 Sept 2026
Full Reactors & SMRs ranking Spot an error? Send a tip