Olkiluoto-3 ranks #4 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,575 MWe); Peach Bottom-3 ranks #10 (1,331 MWe).
Rank 04 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,575 MWe
MakerTVO (EPR)
Date2022
Verified04 Sept 2026
Evidence
IAEA PRIS Finland country table: OLKILUOTO-3 Operational, Reference Unit Power 1575 MW, Gross 1660 MW, first grid 2022-03-12. TVO technical page states net electrical power as approx. 1600 MW. Rank uses the PRIS reference net, not TVO's rounded approx.Rank 10 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,331 MWe
MakerConstellation (BWR-4)
Date1974
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, PEACH BOTTOM-3, Operational: Reference Unit Power 1331 MWe, Design Net 1065, Gross 1412, Thermal 3951 MWt. First grid 1 Sep 1974. Uprated well above original design net; 2019-2025 history rows carry 1331 MW. Peach Bottom-2 on the same site is 1300 MWe net and was not needed once ten rows were filled.Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page