Taishan-2 vs Flamanville-3

RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE) #2 VS #3 CHECKED 06 SEPT 2026
Side by side
Verdict

Taishan-2 ranks #2 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,660 MWe); Flamanville-3 ranks #3 (1,600 MWe).

Rank 02 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,660 MWe
MakerCGN / EDF (EPR)
Date2019
Verified04 Sept 2026
Evidence
IAEA PRIS China country table: second Taishan unit Operational, Reference Unit Power 1660 MW, Gross 1750 MW, first grid 2019-06-23. Tied with Taishan-1 on net output.
Rank 03 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,600 MWe
MakerEDF (EPR)
Date2024
Verified04 Sept 2026
Evidence
EDF Flamanville 3 site: EPR of about 1,600 MWe; the three-unit site page lists 2x1300 MW + 1x1600 MW. First grid connection 21 Dec 2024. EDF 14 Dec 2025: first time at 100% nuclear thermal power, 1,669 MW gross electrical. EDF still describes industrial commissioning tests as continuing in 2026 — included because it is grid-connected and has run at full thermal power, with that caveat here.