Space Computing Energy Tech Transport Science Dev Loyalty ↗ ◐ Dark mode ◎ Enable Alerts
Compare · Wind turbines

GWH252-16MW vs MySE 16-260

RANKED BY RATED CAPACITY OF A COMMERCIAL TURBINE (MW) #4 VS #5 CHECKED 06 SEPT 2026
Side by side
Verdict

GWH252-16MW ranks #4 of 9 on Rated capacity of a commercial turbine (MW) (16.0 MW); MySE 16-260 ranks #5 (16.0 MW).

Rank 04 of 9 · leads
Rated capacity of a commercial turbine (MW)
16.0 MW
MakerGoldwind
Date2024
Verified04 Sept 2026
Evidence
Goldwind official news 1 Jul 2024: Zhangpu Phase II full-capacity grid connection of 20 Goldwind GWH252-16MW and GWH252-14.3MW turbines. Rotor 252 m. Later GWH252-16-F floating variant installed Oct 2025.
Rank 05 of 9
Rated capacity of a commercial turbine (MW)
16.0 MW
MakerMingyang
Date2026
Verified04 Sept 2026
Evidence
Mingyang / CNOOC Anlan TLP: MySE 16-260, 16 MW, 260 m rotor, commissioned as a 16 MW tension-leg-platform floating turbine supplying the Lufeng oilfield. Tied on nameplate with Goldwind GWH252-16MW.
Try another pair
Source Manufacturer product pages and official installation posts (Mingyang, Goldwind, Vestas, Siemens Gamesa, GE Vernova) Last checked 06 Sept 2026
Full Wind turbines ranking Spot an error? Send a tip