Space Computing Energy Tech Transport Science Dev Loyalty ↗ ◐ Dark mode ◎ Enable Alerts
Launches Missions Watch Orbital Events News Rockets Agencies Vehicles Astronauts Satellites Archive Future
Space · launch vehicle

Commercial Titan III

LMT RETIRED
At a glance
Launches
4
Success rate
100%
4 ok · 0 failed
Payload to LEO
14,742 kg
Payload to GTO
4,990 kg
Manufacturer
Lockheed Martin
Status
Retired
First flight
01 Jan 1990
Reusable
No
Height
47.3 m
Diameter
3.05 m
Launch mass
680 t
Liftoff thrust
—
Stages
3
Launch cost
—
Booster landings
—
About

The Commercial Titan III, also known as CT-3 or CT-III, was an American expendable launch system, developed by Martin Marietta during the late 1980s and flown four times during the early 1990s. It was derived from the Titan 34D, and was originally proposed as a medium-lift expendable launch system for the US Air Force, who selected the Delta II instead. Development was continued as a commercial launch system, and the first rocket flew in 1990. Due to higher costs than contemporary rockets such as the Ariane 4, orders were not forthcoming, and the CT-3 was retired in 1992.