Compare · Reactors & SMRs
Civaux-2 vs Peach Bottom-3
RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE)
#7 VS #10
CHECKED 06 SEPT 2026
Side by side
Verdict
Civaux-2 ranks #7 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,495 MWe); Peach Bottom-3 ranks #10 (1,331 MWe).
Rank 07 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,495 MWe
MakerEDF (N4)
Date1999
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, CIVAUX-2, Operational, model N4 REP 1450: Reference Unit Power 1495 MWe, Design Net 1450, Gross 1561, Thermal 4270 MWt. First grid 24 Dec 1999. Tied with Civaux-1.Rank 10 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,331 MWe
MakerConstellation (BWR-4)
Date1974
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, PEACH BOTTOM-3, Operational: Reference Unit Power 1331 MWe, Design Net 1065, Gross 1412, Thermal 3951 MWt. First grid 1 Sep 1974. Uprated well above original design net; 2019-2025 history rows carry 1331 MW. Peach Bottom-2 on the same site is 1300 MWe net and was not needed once ten rows were filled.Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page
Last checked 06 Sept 2026