Compare · Reactors & SMRs
Civaux-2 vs Saeul-2
RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE)
#7 VS #9
CHECKED 06 SEPT 2026
Side by side
Verdict
Civaux-2 ranks #7 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,495 MWe); Saeul-2 ranks #9 (1,392 MWe).
Rank 07 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,495 MWe
MakerEDF (N4)
Date1999
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, CIVAUX-2, Operational, model N4 REP 1450: Reference Unit Power 1495 MWe, Design Net 1450, Gross 1561, Thermal 4270 MWt. First grid 24 Dec 1999. Tied with Civaux-1.Rank 09 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,392 MWe
MakerKHNP (APR-1400)
Date2019
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, SAEUL-2, Operational, model APR-1400: Reference Unit Power 1392 MWe, Design Net 1340, Gross 1491, Thermal 3983 MWt. First grid 22 Apr 2019. 2024 history row uses 1392 MW (earlier years on the same page used 1418). Saeul-1 is the twin; its current live PRIS net was not loaded in this pass so it is not given a separate row.Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page
Last checked 06 Sept 2026
