Flamanville-3 vs Peach Bottom-3

RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE) #3 VS #10 CHECKED 06 SEPT 2026
Side by side
Verdict

Flamanville-3 ranks #3 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,600 MWe); Peach Bottom-3 ranks #10 (1,331 MWe).

Rank 03 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,600 MWe
MakerEDF (EPR)
Date2024
Verified04 Sept 2026
Evidence
EDF Flamanville 3 site: EPR of about 1,600 MWe; the three-unit site page lists 2x1300 MW + 1x1600 MW. First grid connection 21 Dec 2024. EDF 14 Dec 2025: first time at 100% nuclear thermal power, 1,669 MW gross electrical. EDF still describes industrial commissioning tests as continuing in 2026 — included because it is grid-connected and has run at full thermal power, with that caveat here.
Rank 10 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,331 MWe
MakerConstellation (BWR-4)
Date1974
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, PEACH BOTTOM-3, Operational: Reference Unit Power 1331 MWe, Design Net 1065, Gross 1412, Thermal 3951 MWt. First grid 1 Sep 1974. Uprated well above original design net; 2019-2025 history rows carry 1331 MW. Peach Bottom-2 on the same site is 1300 MWe net and was not needed once ten rows were filled.
Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page Last checked 06 Sept 2026
Full Reactors & SMRs ranking Spot an error? Send a tip