Compare · Reactors & SMRs
Saeul-2 vs Peach Bottom-3
RANKED BY NET ELECTRICAL OUTPUT OF ONE CURRENTLY OPERATIONAL REACTOR UNIT (MWE)
#9 VS #10
CHECKED 06 SEPT 2026
Side by side
Verdict
Saeul-2 ranks #9 of 10 on Net electrical output of one currently operational reactor unit (MWe) (1,392 MWe); Peach Bottom-3 ranks #10 (1,331 MWe).
Rank 09 of 10 · leads
Net electrical output of one currently operational reactor unit (MWe)
1,392 MWe
MakerKHNP (APR-1400)
Date2019
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, SAEUL-2, Operational, model APR-1400: Reference Unit Power 1392 MWe, Design Net 1340, Gross 1491, Thermal 3983 MWt. First grid 22 Apr 2019. 2024 history row uses 1392 MW (earlier years on the same page used 1418). Saeul-1 is the twin; its current live PRIS net was not loaded in this pass so it is not given a separate row.Rank 10 of 10
Net electrical output of one currently operational reactor unit (MWe)
1,331 MWe
MakerConstellation (BWR-4)
Date1974
Verified04 Sept 2026
Evidence
IAEA PRIS Reactor Details, PEACH BOTTOM-3, Operational: Reference Unit Power 1331 MWe, Design Net 1065, Gross 1412, Thermal 3951 MWt. First grid 1 Sep 1974. Uprated well above original design net; 2019-2025 history rows carry 1331 MW. Peach Bottom-2 on the same site is 1300 MWe net and was not needed once ten rows were filled.Try another pair
Source IAEA PRIS reactor-detail and country pages; EDF Flamanville 3 operator page
Last checked 06 Sept 2026
